Progress cannot outrun quality.

Inspections in Proprite are gates, not paperwork. If a required check fails, the inspection cannot be approved — and the work or material behind it cannot move forward.
Lifecycle stage
  • 05Quality control
Used by
Project Manager, Site Engineer, Store Manager and Purchase Manager

Interactive illustration with sample data. Try the controls.

What gets inspected

Quality control covers the two things that end up in a building: the work done on site and the material delivered to it.

  • Construction work inspections
  • Delivered material inspections

Checklists

Each checklist item can require a pass or fail, remarks, and a photo as evidence.

  • Pass / fail per item
  • Remarks
  • Photo requirement

The hard rule

If a required check fails, the inspection cannot be approved. There is no override.

  • Failed required checks block approval
  • No override path

Gates on the work

Quality results are connected to the schedule and the store, so a failed check holds up the next step in the system — not just in a report.

  • The next dependent activity cannot start until the previous QC passes
  • Delivered material does not become stock until QC passes

Rules built into Quality Control.

  • Required checks that fail block approval — no override

  • Dependent activities wait for QC to pass

  • Material enters stock only after QC passes

  • Photo evidence can be made mandatory per item

Questions about Quality Control

  • No. If a required check fails, the inspection cannot be approved. The work has to be corrected and inspected again.